Health Center at Cornell University

Health Center at Cornell University

Ithaca, New York, USA

A PHP Error was encountered

Severity: Warning

Message: count(): Parameter must be an array or an object that implements Countable

Filename: views/project.php

Line Number: 30

Backtrace:

File: /usr/home/penetronsp/public_html/penetronsp.com/application/views/project.php
Line: 30
Function: _error_handler

File: /usr/home/penetronsp/public_html/penetronsp.com/application/views/template.php
Line: 16
Function: view

File: /usr/home/penetronsp/public_html/penetronsp.com/application/controllers/Projects.php
Line: 91
Function: view

File: /usr/home/penetronsp/public_html/penetronsp.com/application/controllers/Projects.php
Line: 19
Function: view

File: /usr/home/penetronsp/public_html/penetronsp.com/index.php
Line: 294
Function: require_once

Category: Healthcare

The new Cornell Health facility needed a reliable vapor reduction system to withstand the high traffic environment and unexpectedly high relative humidity (RH) readings. The $55 million renovation and expansion project included installation of new flooring for over 25,000 square feet (2,330 m2) of concrete.

Products Used

PENETRON Specialty Products helped keep the project on schedule by specifying PENETRON’s moisture vapor reduction system: VB 225, PRIMER STX 100 and SURFIX FEP (feather edge patch). The finished flooring included vinyl enhanced tile, carpet tile, and resilient sheet goods.

Related Press

November 14, 2016 - PENETRON Flooring Helps Student Health at Cornell University


Products Used