UMASS New Laboratory Science Building

UMASS New Laboratory Science Building

Amherst, Massachusetts, USA

A PHP Error was encountered

Severity: Warning

Message: count(): Parameter must be an array or an object that implements Countable

Filename: views/project.php

Line Number: 30

Backtrace:

File: /usr/home/penetronsp/public_html/penetronsp.com/application/views/project.php
Line: 30
Function: _error_handler

File: /usr/home/penetronsp/public_html/penetronsp.com/application/views/template.php
Line: 16
Function: view

File: /usr/home/penetronsp/public_html/penetronsp.com/application/controllers/Projects.php
Line: 91
Function: view

File: /usr/home/penetronsp/public_html/penetronsp.com/application/controllers/Projects.php
Line: 19
Function: view

File: /usr/home/penetronsp/public_html/penetronsp.com/index.php
Line: 294
Function: require_once

Category: Education

This new imaging and computation lab center had 100,000 sq. ft. (9,290 m2) of new concrete with elevated moisture content. Flooring with a mitigation system (VB 225, PRIMER STX 100 and LEVELINE 15) was installed for immediate installation of the final floor cover.


Products Used